This website uses cookies to store information on your computer. Some of these cookies are used for visitor analysis, others are essential to making our site function properly and improve the user experience. By using this site, you consent to the placement of these cookies. Click Accept to consent and dismiss this message or Deny to leave this website. Read our Privacy Statement for more.
ICRI 1999 Project Award Winner
Share |

Project of the Year: High-Rise Category

Structural Modifications to Comete Guam
grey line

Tumon Bay, Guam

Submitted by Structural Technologies, Inc.

Comete GuamThe Comete Guam building was constructed during 1996 and 1997 and was originally proposed for retail and department store development. In mid-1998 the owners amended the proposed use to that of an indoor aquarium, virtual-reality indoor theme park, and restaurant. To accommodate Underwater World, a 750,000 gallon (3.4 million liter) indoor aquarium with 400 linear feet (120 m) of walk-through tunnel, featuring marine life indigenous to Micronesia, was constructed. Gameworks required several virtual-reality games such as an IMAX ride-theater to be supported on existing suspended floors.

Sam Choy’s Restaurant required significant structural revisions to accommodate new stair access and mechanical openings. Large openings were required, of dimensions 20 feet by 24 feet (6 m by 7 m), in the existing bonded post-tensioned (PT) floor system. Given the corrosive environment of the proposed aquarium tank, carbon fiber was selected as a superior material for strengthening the adjacent slabs and beams. The controlled demolition of the floor openings was undertaken by first detecting the PT tendons using non-destructive testing techniques. Then using diamond-blade-floor and track-mounted saws, panels were cut and lowered.

The application of carbon-fiber reinforcement was the first for Guam and Micronesia, and a series of large-scale tests were conducted to verify the technology. Three 12-foot (3 m) long beam specimens were tested in flexure to failure to demonstrate the ability of these advanced materials to strengthen existing concrete structures.

Several hundred floor penetrations were required to accommodate mechanical services for marine life and human occupants. All PT tendons were located using electro-magnetic testing equipment to allow the mechanical contractor to avoid severing PT tendons.

ICRI Supporting Members

ICRI

International Concrete Repair Institute, Inc.
1000 Westgate Drive, Suite 252
St. Paul, Minnesota 55114 USA
Phone: +1 651-366-6095

Copyright © 2015-2019 International Concrete Repair Institute, Inc. (ICRI) All rights reserved.

Privacy Policy | Antitrust Policy | Terms of Use | Contact Us | Site Map

This website is optimized for Firefox and Chrome.
If you have difficulties using this site, see complete browser details.