This website uses cookies to store information on your computer. Some of these cookies are used for visitor analysis, others are essential to making our site function properly and improve the user experience. By using this site, you consent to the placement of these cookies. Click Accept to consent and dismiss this message or Deny to leave this website. Read our Privacy Statement for more.
ICRI 2010 Project Award Winner
Share |

Award of Merit: Water Structures Category

Deep Drainage System Evaluation and Rehabilitation
grey line

Mexico DF

Submitted by BASF Corporation


Deep Drainage System

Owner
Sistema de Aguas de la Ciudad de México
México DF

Project Engineer/
Designer

Intituto de Ingenieria UNAM
Mexico City, Mexico

Repair Contractor
Lombardo Construcciones SA
México DF

Material Supplier/
Manufacturer

BASF Mexicana
México DF

The Drenaje Profundo of Mexico City (Deep Central Drainage) is a tunnel with a depth of 164 ft (50 m) and a diameter of 21.3 ft (6.5 m) that began operation in 1975. This system was designed for the removal of sewage and rainwater in Mexico City, which includes integrated Interceptors Center West, Central, and East with an overall length of 103 miles (166 km). 

In 2006, the staff of the Water Authority of Mexico City carried out inspections inside tunnels that had an inadequate hydraulic performance. These examinations revealed deterioration of the tunnel coating and exposure of reinforcing steel with resulting steel corrosion and loss of section. The concrete inside the pipeline was heavily damaged by the hydrogen sulfide gas caused by decomposition of organic matter in the wastewater—mostly in the crown of the tunnel—and damage in the bottom of the tunnel caused by the scour of solids. 

A method was developed to repair the deterioration using a system that provided chemical resistance to this type of hydrogen sulfide attack. The surface was prepared and mortar was pneumatically applied. The final surface was given a two-part chemical-resistant coating. The rehab- ilitation following this procedure was made in 0.9 miles 
(1.5 km) of tunnel.

ICRI Supporting Members

ICRI

International Concrete Repair Institute, Inc.
1000 Westgate Drive, Suite 252
St. Paul, Minnesota 55114 USA
Phone: +1 651-366-6095

Copyright © 2015-2019 International Concrete Repair Institute, Inc. (ICRI) All rights reserved.

Privacy Policy | Antitrust Policy | Terms of Use | Contact Us | Site Map

This website is optimized for Firefox and Chrome.
If you have difficulties using this site, see complete browser details.