AWARD OF MERIT:
Special Projects Category
STRENGTHENING OF TUBULAR CENTRIFUGED
POSTS

Sao Paulo, Brazil
Submitted by Degussa Construction Chemicals Latin America
|
 |
The
main objective of this repair project was to strengthen
reinforced concrete poles. This project was necessary
to correct the original design deficiencies that caused
a total of eight collapsed concrete telephone poles to
date in Brazil. In each of the known collapses, the failure
occurred within the development length between the first
module (fixed to the ground) and the second module.
Before the companies involved in the project—the
repair contractor and the project engineer—learned
about this predicament, several posts were removed and
replaced by metallic towers. After investigation, the
aforementioned team decided to present the owners with
an alternative approach: the carbon fiber-reinforced polymer
(CFRP) concept, as an ideal solution for their particular
case.
The structural solution employed, which was used on 150
poles, was to apply an average of 540 square ft (50 square
m) of CFRP system to each pole to be repaired. The heights
of these concrete poles varied incrementally from 60 to
197 ft (20 to 60 m).
On average, the rehabilitation cost is approximately 1/3 of the value of the removal and replacement
of the post by a metallic tower. This provides an attractive
option for the companies in this business both in time
and repair costs. It also provides a solution to the design
of any additional new concrete poles to be installed in
the future, instead of losing the market to metal poles.
|
|
Owner
Telesp Celular (VIVO)
Sao Paulo, Brazil
Project Engineer/ Designer
Paula Machado Engenharia de Projectos
Belo Horizonte, Brazil
Repair Contractor
PhDesign Concreto, Construcao e Reabilitacao Ltd.
Sao Paulo, Brazil
Material Suppliers/ Manufacturer
Degussa Construction Chemicals Brazil
Sao Paulo, Brazil
|
|