Submitted by Kinectrics, Inc.
|
 |
R.H. Saunders Generating Station (GS) experienced many operational and structural problems
commencing in 1972. Subsequent unit inspections revealed that the generators stators and throat ring
liners were deforming. In addition, the powerhouse concrete structure was deteriorating with
extensive cracking, distortion and water leakage.
In 1990, an extensive engineering investigation was launched to determine the root cause of the
generating equipment and structure problems. Concrete expansion due to Alkali-Aggregate Reaction
(AAR) was diagnosed in 1991 as the root cause of concrete movement and ensuing
generator and structural problems. Concrete and generator condition assessments, laboratory analysis, field tests,
installation of numerous monitoring devices to monitor deformations in the powerhouse and
mathematical modeling were utilized to establish rehabilitation needs. A proactive rehabilitation
program was implemented from 1993 to 2001, to mitigate the effects of AAR-induced concrete
expansion and repair the concrete structural damage.
Slots were successfully cut between the generators along the expansion/contraction joints of the
concrete structure, using diamond wire technology. The immediate results were encouraging, with
reduced compressive stresses in the concrete, increased runner clearances and partial rounding of the
throat ring liners. Numerous innovative techniques were implemented to rehabilitate structural
components that were severely damaged by concrete expansion at the powerhouse. Specially
designed waterstops to control water leakage, extensive grouting utilizing a combination of epoxies,
polyurethanes, polyesters, microfine and Portland cement grouts to restore structural/waterproofing
integrity were used throughout the powerhouse structure.
Extensive removal and retrofitting of damaged concrete components using high-performance silica
fume, fiber-reinforced, polymer-modified and high-strength repair materials and concrete were used.
Installation of post-tensioned anchors and new structure corbel supports utilizing Teflon and other
friction-reducing systems were installed to accommodate future movements and concrete damage.
Installation of high performance coatings and sealants were applied to various concrete structures to
provide waterproofing barriers and oil containment.
|
|
Owner
Ontario Power Generation
R.H. Saunders Generating Station
Cornwall, Ontario, Canada
Project Engineer/ Designer
Ontario Power Generation
Toronto, Ontario, Canada
Repair Contractor
Kinectrics, Inc.
Toronto, Ontario, Canada
Material Suppliers
Master Builders Technologies, Ltd.
Brampton, Ontario, Canada
Concrete Restoration Services, Ltd.
Winnipeg, Manitoba, Canada |
| |
|